SHORT-TERM GENERATION SCHEDULING OF HYDRAULIC MULTI-RESERVOIR MULTIAREA INTERCONNECTED SYSTEMS

被引:35
作者
AMADO, SM [1 ]
RIBEIRO, CC [1 ]
机构
[1] PONTIFICIA UNIV CATOLICA RIO DE JANEIRO,BR-20000 RIO DE JANEIRO,RJ,BRAZIL
关键词
D O I
10.1109/TPWRS.1987.4335206
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
引用
收藏
页码:758 / 763
页数:6
相关论文
共 16 条
[1]  
AMADO SM, 1986, THESIS FEDERAL U RIO
[2]   OPTIMAL SHORT-TERM SCHEDULING OF LARGE-SCALE POWER-SYSTEMS [J].
BERTSEKAS, DP ;
LAUER, GS ;
SANDELL, NR ;
POSBERGH, TA .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1983, 28 (01) :1-11
[3]  
FORTUNATO LAM, 1985, JUL IFAC S PLANN OP, P193
[4]   NEW ALGORITHM FOR SOLUTION OF MULTISTATE DYNAMIC-PROGRAMMING PROBLEMS [J].
HOWSON, HR ;
SANCHO, NGF .
MATHEMATICAL PROGRAMMING, 1975, 8 (01) :104-116
[5]   SOLUTION OF LARGE-SCALE OPTIMAL UNIT COMMITMENT PROBLEMS [J].
LAUER, GS ;
SANDELL, NR ;
BERTSEKAS, DP ;
POSBERGH, TA .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1982, 101 (01) :79-86
[6]   A NEW METHOD FOR UNIT COMMITMENT AT ELECTRICITE DE FRANCE [J].
MERLIN, A ;
SANDRIN, P .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1983, 102 (05) :1218-1225
[7]   APPLICATION OF LAGRANGIAN RELAXATION TO SCHEDULING IN POWER-GENERATION SYSTEMS [J].
MUCKSTADT, JA ;
KOENIG, SA .
OPERATIONS RESEARCH, 1977, 25 (03) :387-403
[8]   OPTIMAL HYDROTHERMAL SCHEDULING WITH CASCADED PLANTS USING PROGRESSIVE OPTIMALITY ALGORITHM [J].
NANDA, J ;
BIJWE, PR .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1981, 100 (04) :2093-2099
[9]  
PEREIRA MVF, 1985, JUL IFAC S PLANN OP, P1
[10]   BIBLIOGRAPHY ON OPTIMAL RESERVOIR DRAWDOWN FOR THE HYDROELECTRIC THERMAL POWER SYSTEM OPERATION [J].
SACHDEVA, SS .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1982, 101 (06) :1487-1496