REVAMPING OF THE COKING CAPACITY OF SOLLAC-DUNKERQUE COKE-OVEN PLANT

被引:1
作者
DELANNAY, G [1 ]
TROLLER, JL [1 ]
REKIK, A [1 ]
机构
[1] CDF INGN,DEPT CARBONISAT & IND,CTR ETR DOUAI,DOUAI,FRANCE
来源
REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES | 1993年 / 90卷 / 01期
关键词
D O I
10.1051/metal/199390010035
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
This renovation accompanies the coal injection progress in the blast furnaces and the development in matter of environment protection. With the improvement of regularity of operation, of works conditions (modern and ergonomic machines), of safety and coke quality, it enables to reach, step by step, only one economical unit which will be operated about year 2000.
引用
收藏
页码:35 / 42
页数:8
相关论文
共 5 条
  • [1] GARIN J, 1989, REV METALLURGIE FEV, P121
  • [2] LEMOUEL D, 1992, REV METALLURGIE MAI, P455
  • [3] MEUNIER M, 1973, REV METALLURGIE NOV, P757
  • [4] MEUNIER M, 1971, REV METALLURGIE NOV, P681
  • [5] TROLLER JL, 1991, COKE MAKING INT, V3