共 50 条
- [34] A Genetic Algorithm to Minimize the Makespan in a Two-Machine Cross-Docking Flow Shop Problem Journal of the Operations Research Society of China, 2020, 8 : 457 - 476
- [35] An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs 4OR, 2010, 8 : 87 - 99
- [38] Minimizing makespan in an ordered flow shop with machine-dependent processing times Journal of Combinatorial Optimization, 2011, 22 : 797 - 818
- [39] An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2010, 8 (01): : 87 - 99